Bali Hai II Refit

The refit of the Bali Hai II vessel spanned just over two and a half months. It was originally built by Austal Ships Pte Ltd on 6th Dec 1993 with MJP 650 water jets. Prior to the re-powering, the Bali Hai was running at a top speed of only 17 knots. After the refit of the engine and propulsion system, the vessel now reaches a maximum speed of 29.8 knots within minutes. In conjunction with many local and Australian Suppliers, the vessel was stripped bare and refurbished throughout the three stories to return to its operating commute between Benoa Harbour to the island of Nusa Lembongan before Christmas 2017.

SPECIFICATIONS

ENGINE

2 x MTU 16V 2000m72 engines

Propulsion

2 x HM811 water jets

Length

38 Metres

Beam

11 Metres

Draft

1.2 Metres

  • Designer

    Austal Ships Pte Ltd

    Builder

    Austal Ships Pte Ltd

    Type of Vessel

    Catamaran Ferry

    DATE OF COMISSIONING

    Dec 2017

    MAX SPEED

    29.4 knots

    Cruising speed

    18 knots @ 1800RPM

    FUEL CAPACITY

    18,000 Litres

    FRESHWATER CAPACITY

    6000 Litres

    Passengers

    315

    Crews

    16

  • PRODUCTS & SERVICES